Bathrooms That Last.
— Waterproofing and tile work that holds up — not just looks good on day one.
Powder rooms to primary ensuites.
Bathrooms are where bad work shows up the fastest — failed grout, leaking shower pans, soft floors behind the toilet. We build bathrooms to be tight, dry and quiet for decades. Every project gets proper substrate, full waterproofing membrane in wet zones, and tile work installed by trades that do this every day.
From a quick powder-room refresh to a from-scratch primary ensuite with a walk-in shower, freestanding tub, double vanity and heated floors — we run the whole job under one roof, with one accountable team.
- Full demo, framing changes and structural adjustments (relocating walls, drains)
- Waterproofing in wet zones — proper membrane, not just sealant
- Custom shower builds: curbless, walk-in, steam-rated, bench seats
- Tile work that's set right: porcelain, marble, hex, large-format slabs
- Vanities — stock, semi-custom, or fully custom millwork
- Heated floors, exhaust fans on humidity sensors, dimmer-controlled lighting
- Plumbing rough-in, fixture installation, and inspections handled
The bathrooms we get asked for most.
Primary Ensuite
Walk-in shower, freestanding tub, double vanity, heated floors. The room you actually want to spend time in. Usually 4–6 weeks on site.
Main Bath / Kids' Bath
Family-grade durability — proper waterproofing, easy-clean tile, vented exhaust, and finishes that survive everyday use. 3–4 weeks on site.
Powder Room
Small-footprint refresh with big visual impact — wallpaper, vanity, lighting, sometimes a feature wall. 1–2 weeks on site.
Basement Bath
New full or three-piece bath in a basement reno — including breaking concrete for proper drain routing where needed. Code-compliant from the start.
Straight answers.
How long does a bathroom renovation take?
Most full bathroom rebuilds run 3–6 weeks of on-site work depending on scope. Custom showers, tile work, and primary ensuites with relocated plumbing sit at the longer end. We give you a real timeline before you sign.
How much does a bathroom remodel cost?
In our market, full bathroom remodels typically run $18,000–$45,000+ depending on size, fixtures, tile selections and whether plumbing or framing changes are needed. Your free estimate gives you a real number, not a ballpark.
Do you handle the waterproofing yourselves?
Yes. Wet-zone waterproofing is one of the most-skipped or worst-done steps by lower-cost contractors. We install proper membrane systems before any tile goes down — that's what keeps your bathroom dry 10 years from now.
Can you add a bathroom where there wasn't one before?
Often, yes — especially in basement renovations and full-home rebuilds. We handle drain routing, venting, and any structural or permit work required. Some second-floor additions need engineering; we'll tell you straight what's possible at your estimate.
Ready to upgrade your bathroom?
Book a free, no-obligation on-site estimate. We'll walk your space, talk through what you want, and give you a straight answer on scope, timeline and cost.
